Mapei Eporip Epoxy Crack Repair Adhesive is a two component, solvent-free epoxy adhesive for construction joints and for monolithic sealing of cracks in screeds. Available in two pack sizes, 10kg and 2kg.

Where to use:

  • Monolithic construction joints between fresh and hardened concrete.
  • Bonding precast concrete elements.
  • Bonding steel to concrete.
  • Filling cracks in concrete.

Some application examples:

  • Construction joints for the structural reinforcement of beams and pillars.
  • Construction joints on decayed industrial flooring.
  • Rigid, waterproof construction joints (e.g. concrete bed to tank walls).
  • Reinforcement of beams by means of the béton plaqué technique.
  • Sealing cracks in cement screeds.

Mapei Eporip Epoxy Crack Repair Adhesive is a solvent-free epoxy adhesive consisting of two pre-measured components (component A = resin, component B = hardener) that have to be mixed before use. Mapei Eporip has the consistency of a slightly thixotropic paste that can be applied by brush on both horizontal and vertical surfaces.

Mapei Eporip polymerises without shrinkage and, after curing, is waterproof, possesses excellent dielectric properties and high mechanical characteristics in addition to its ability to bond concrete and steel.

Recommendations:

  • Do not apply Eporip at temperatures lower than +5°C.
  • Do not use Mapei Eporip on wet surfaces (even though they can be slightly damp).
  • Do not cast fresh concrete onto hardened Eporip.
  • Do not use Mapei Eporip on dusty, crumbling or loose surfaces.

Application:

Preparation of the substrate:
Before the application of Mapei Eporip Epoxy Crack Repair Adhesive, the substrate must be perfectly clean, solid and strong. All loose and crumbling parts, dust, cement laitance and traces of form-release oils and paint must be eliminated by careful sandblasting or brushing. When applying the product to metal, remove any rust and grease residues beforehand, preferably by means of sand-blasting to white metal.

Preparing the mix:
The two Mapei Eporip components have to be mixed.
Pour component B (white) into component A (grey) and mix with a trowel for small quantities or with a drill fitted with a low speed stirrer for large batches until the mix is perfectly smooth and even (the same grey all through). Do not use partial amounts to avoid the risk of accidental ratio errors that could prevent Mapei Eporip from curing.

Applying the mix:
Mapei Eporip can be applied with a flat trowel or a brush on dry or slightly damp concrete. It is advisable to let the product penetrate well into particularly uneven and porous areas so as to ensure perfect adhesion to the whole surface being treated.
The subsequent layer of fresh concrete must be placed within the open times according to the temperature indicated in the technical data table.
When Mapei Eporip is used to seal cracks wider than 0.5 mm, simply placing is sufficient. In this case it is recommended to spread sand over the Eporip surface in order to favour bonding of product that may be applied subsequently.
If the cracks are narrower than 0.5 mm, they have to be widened and then dusted well before repair work with Eporip. Do not use Mapei Eporip when the outside temperature of the substrate is lower than +5°C.

Consumption:

Consumption varies, depending on irregularities in the substrate and the method used in application.
Generally speaking:
▪ construction joints with a rough substrate: 0.5-0.7 kg/m²
▪ construction joints with a very uneven substrate: 1.0-2.0 kg/m²
▪ sealing cracks: 1.35 kg/l per litre of cavity
▪ bonding precast elements in concrete, or steel-and-concrete: 1.35 kg/m² per mm thickness.

Technical Data:
Mixing ratio: component A : component B = 3 : 1
Consistency of mix: fluid paste
Colour of mix: grey
Density of mix: 1.35 kg/l
Brookfield viscosity: 4.5 Pa·s (rotor 5 – 20 revs)
Workability time (EN ISO 9514):
– at +10°C: 90 minutes
– at +23°C: 60 minutes
– at +30°C: 40 minutes
Open time:
– at +10°C: 5-6 hours
– at +23°C: 3-4 hours
– at +30°C: 1 hour 30 minutes-2 hours 30 minutes
Application temperature range: from +5°C to +30°C
Complete hardening time: 7 days

Product Datasheet

Click here to view this product on the Manufacturers website.

Additional information

Weight N/A
Size

10kg, 2kg

Reviews

There are no reviews yet

Add a review
You must be logged in to post a review Log In